Client: Chevron, supplied via a Perth-based procurement partner
Industry: Oil and gas, remote industrial operations
Application: Humidity control in fly-in fly-out accommodation units
Solution: High-volume commercial dehumidifiers
Location: Barrow Island and Wheatstone, Western Australia
Scale: More than 1,500 units across multiple shipments
Barrow Island is a remote, environmentally sensitive location off the Western Australian coast, and the site of one of the country’s largest gas infrastructure projects, operated by Chevron.
Moisture Cure supplied humidity control for the on-site accommodation units through a long-standing Perth-based procurement partner.
Results at a Glance
- 1,500+ units supplied across the LNG projects
- 50-unit trial followed by an 850-unit order
- 4 further bulk shipments of 200 to 500 units
- Filled from Australian stock, no import lead time
The Challenge
The dongas used by fly-in fly-out workers sit in heat, humidity and salt-laden coastal air continuously.
That combination attacks both the living environment and the fabric of the units themselves.
The requirement was for equipment that could be:
- Supplied in large quantities against a project schedule
- Relied on in extreme coastal conditions
- Maintained simply, because service attendance on a remote island is expensive and slow
Our Solution
The engagement started with a trial order of 50 units to prove performance on site before committing.
The trial succeeded, and within weeks a follow-up order of 850 units was placed and filled immediately from existing Australian stock.
Supply since then has included:
- Four further bulk shipments ranging from 200 to 500 units
- A mix of models matched to different accommodation and support building types
- Ongoing supply across both the Barrow Island and Wheatstone projects
Holding local stock was the deciding factor on the 850-unit order. An import lead time at that point would have pushed the delivery past the project’s need-by date.
Results and Impact
Reported outcomes:
- More than 1,500 units supplied across the LNG projects
- Proven durability in one of Australia’s harshest operating environments
- Rapid turnaround from Australian stock rather than import lead time
- An ongoing supply relationship with Chevron across multiple project phases
This remains one of the largest deployments Moisture Cure has delivered, and the one that demonstrates capacity to scale without changing the specification.
Why a Trial Order Was the Right Start
Committing 850 units to a remote island on a specification sheet is a large risk to carry.
The 50-unit trial removed that risk for a fraction of the cost of getting it wrong.
A site trial answers questions a datasheet cannot:
- How the unit behaves in salt-laden air over months, not hours
- Whether the maintenance interval is realistic for the site’s actual service access
- Whether the accommodation units’ power and drainage arrangements suit the equipment as delivered
- What the failure rate looks like when handling and installation are done by site crews rather than technicians
For any bulk deployment into a remote location, a trial batch is the cheapest insurance available.
Related Solutions
- mining equipment storage humidity protection. The same coastal corrosion risk applies to plant and equipment stored on these sites.
- commercial and industrial dehumidifiers. The full range covers the accommodation, workshop and storage loads found on a remote resources site.
Bulk Supply for Remote Projects
Remote projects live and die on lead time, and stock held in Australia is worth more than a lower unit price arriving late.
Contact Moisture Cure Commercial to discuss volume requirements, staged delivery and site trials.
Contact Moisture Cure Commercial for expert sizing advice on your application.